The CIG Inspection Report is used and completed by the Inspector either during pre-licence inspections or during routine inspections. Completion of this report during the pre-licence inspection will take into account the previous information as given in CIG 422 Section B and compare this with the situation observed at the Factory. The intention of completing this report during the routine inspection is to verify and document that the factory still complies with the requirements of the CIG Inspection Scheme and the requirements of the Certification Bodies Schemes.
The CIG Inspection Report is applied by all CIG Members in the same way. One report is issued per visit and factory for all products certified by one or multiple Certification Body (s).
The CIG Inspection Report is also recommended to document the Factory self-assessment of the production and control process of certified products performed by the factory.
Guidance on how to complete the CIG Inspection Report is provided by OD CIG 424.
| 1.6 Inspection Details: | ||||
| Certification Body requesting inspection | Inspection X of Y | Certification Body(ies) Reference No. | Product Category | Kind of Product |
| VDE | 1 of 1 | XX | PROT, INST, CONT | Circuit Breaker, Control Switch |
| SEMKO | 1 of 1 | XX | PROT | Circuit Breakers |
| NEMKO | 1 of 1 | XX | POW, PROT | Circuit Breakers |
| IMQ | 1 of 1 | XX | PROT | Circuit Breakers |
| DEKRA | 1 of 1 | XX | PROT | Circuit Breakers |
| OVE | 1 of 1 | XX | PROT | Circuit Breakers |
| CERTIF | 1 of 1 | XX | PROT | Circuit Breakers |
| AENOR | 1 of 1 | XX | PROT | Circuit Breakers |
| CEBEC | 1 of 1 | XX | CONT, PROT | Circuit Breakers |
| FIMKO | 1 of 1 | XX | PROT | Circuit Breakers |
| LCIE | 1 of 1 | XX | CONT, PROT | Circuit Breakers |
For products holding certifications from multiple CIG Member Bodies:
One CIG Body carries out the factory inspection, applying the harmonized CIG inspection procedures and issuing a single CIG Inspection Report. This report is accepted and recognized by all CIG Members.
See below some examples of how CIG Inspection Reports are completed:
Another major goal of the CIG Inspection Scheme is to provide a structured approach for selecting samples for re-testing directly at the factory.
Where sample selection for re-testing is part of a certification procedure, this can be defined and managed within the CIG inspection processes.
The certification body may also specify particular requirements regarding sample selection, labeling of samples, sealing methods, etc., which will be taken into account by the CIG inspectors.
All of this can be carried out during a single inspection, performed by one CIG inspector, thereby covering the sampling needs of multiple certification bodies.
| SAMPLE SELECTION SHEET | at Factory: XX | Date: XX | ||||
| Selected for | Label No. | Quantity | Product/ Type/Technical data | Licence No. | Production period | Code letters |
| VDE | 218184 | 25 | XX | XX | This month | ☑P F☐ T☐ ☑S A☐ I☐ |
| IMQ | PI.C0004C | 7 | XX | XX | This month | ☑P F☐ T☐ ☑S A☐ I☐ |
| LCIE | 14825 | 7 | XX | XX | This month | ☑P F☐ T☐ ☑S A☐ I☐ |
| AENOR | 0009570 | 5 | XX | XX | This month | ☑P F☐ T☐ ☑S A☐ I☐ |
| It is within the factories responsibility to take the necessary steps to dispatch the units, clear them through customs and pay carriage, in order that the addressee-organisation should not handle any possible custom clearance. | ||||||
P = Sample from Production
T = Transported to the Certification Body by the Inspector
S = Stock
A = Shipped by the Inspection Agency
F = Forwarded by the Factory
I = Selected and tested by the inspector during inspection
The CIG procedures (OD CIG 421), which define the harmonized requirements for factory inspections, include a dedicated clause on Inspector Responsibilities. This clause emphasizes the importance of impartiality in accordance with ISO/IEC 17065, particularly the requirements relating to personnel (Clause 6.1.3).
It requires inspectors to remain independent and free from any activities or influences that could compromise their objectivity. For each inspection assignment, inspectors must not have been directly or indirectly involved in the design, supply, installation, or maintenance of the product concerned within the previous two years or have any other conflict of interest that could affect their impartiality or the credibility of the inspection results.